How do I calculate workshop load from a production plan?
For each work order, multiply the quantity by the cycle time of every routing operation, then add the setup time once. Sum these hours by work center and period: that is the load. CapacityLab does this from your Excel or CSV files, with no formulas to write.
How do I compute utilization and find a bottleneck?
Utilization = loaded hours ÷ available hours. Above 100%, the work center is overloaded for that period. The bottleneck is the work center with the most overload hours. The heatmap shows them in red and the bottleneck table ranks them.
Which files do I need?
Three tables, as sheets of one workbook or separate files: the production plan (order, product, quantity, date or week), routings (product, operation, work center, setup time per lot, cycle time per unit) and capacity (work center, period, available hours or shifts, overtime possible). Columns are detected automatically; download the Excel template to start from an example.
How do I simulate overtime or move an order?
Click Simulate, or Move next to a contributing order. You can move a work order, change a quantity, add overtime or change capacity. Results update instantly and compare overload before and after. Undo and Reset take you back.
Is this a scheduling tool?
No. CapacityLab is an infinite-capacity load calculation: it shows where and when load exceeds capacity, without sequencing operations. It is the capacity check (rough-cut or CRP style) that comes before scheduling.
Is my data sent to a server?
No. Files are read, calculated and exported in your browser. Nothing is uploaded and no account is needed. Closing the tab clears the session, so export your scenario first.